High Efficiency: The diameter of troweling disc is high up to 880 millimeters and the construction area can get to 200~400 square meters per hour.
High Precision:The construction width can get to 2 meters and the troweling deviation is controlled to be less than 5 millimeters.
High Yield:It can save the labor cost by more than 60% and can recover its cost by completing the construction area of 80,000~100,000 square meters.
Slewing Diameter | Slewing Diameter | Rotary Speed Of Wiping Disc | Overall Size | Drive Mode | Control Mode |
300KG | 880mm | 0~150rpm | 2200*880*850mm | Motor drive | Remote Control |
Control Range | Construction Efficiency | Construction Speed | Continuous Working Time | Maximum Angle Of Swing Arm | Rated Power |
200m | 200~400 ㎡/h* | 0~0.45m/s | 4h | 220 ° | 4KW |
*The relevant data comes from the application test of Fangshi Technology engineering