High Efficiency: The diameter of troweling disc is high up to 880 millimeters and the construction area can get to 200~400 square meters per hour.
High Precision:The construction width can get to 2 meters and the troweling deviation is controlled to be less than 5 millimeters.
High Yield:It can save the labor cost by more than 60% and can recover its cost by completing the construction area of 80,000~100,000 square meters.
Weight | 300 kg | Drive Mode | Motor-driven | Work Speed | 0~0.45 m/s |
Slewing Diameter | 880 mm | Control Mode | Remote Control | Continuous Working Time | 4 h |
Rotary Speed Of Wiping Disc | 0~150 rpm | Control Range | 200 m | Maximum Angle Of Swing Arm | 220 ° |
Overall Size | 2200*880*850 mm | Work Efficiency | 200~400 ㎡/h* | Rated Power | 4 kw |
*The relevant data comes from the application test of Fangshi Technology engineering