High Efficiency:Spraying efficiency : 200~300 ㎡/h Grinding efficiency : 70~100 ㎡/h More than 5 times of manual roller coating and polishing
High Precision:Spraying & grinding evenly, no spots, and color differences.
Attitude error: ±1° Positioning accuracy: ±5 cm
High Yield:Three-in-one function Reduce purchasing costs Save labor costs 90%+.
Weight | Overall Size | Spraying Height | Grinding Height | Climbing Angle | Obstacle Crossing Capability | Grinding Efficiency |
745 kg | 1180*850*175 mm | 4.5 m | 4.5 m | 10° | 3 cm | 70~100 ㎡/h* |
Charging Barrel Capacity | Continuous Working Time | Working Temperature | Position Accuracy | Latex Paint Spraying Efficiency | Putty Spraying Efficiency | |
56 L | 6 h | 0-40℃ | ±5 cm | 200~300 ㎡/h* | 100~200 ㎡/h* |
*The relevant data comes from the application test of Fangshi Technology engineering