High Efficiency: The diameter of troweling disc is high up to 880 millimeters and the construction area can get to 200~400 square meters per hour.
High Precision:The construction width can get to 2 meters and the troweling deviation is controlled to be less than 5 millimeters.
High Yield:It can save the labor cost by more than 60% and can recover its cost by completing the construction area of 80,000~100,000 square meters.
Weight  | 300 kg  | Drive Mode  | Motor-driven  | Work Speed  | 0~0.45 m/s  | 
| Slewing Diameter | 880 mm | Control Mode  | Remote Control  | Continuous Working Time  | 4 h  | 
Rotary Speed Of Wiping Disc  | 0~150 rpm  | Control Range  | 200 m  | Maximum Angle Of Swing Arm  | 220 °  | 
Overall Size  | 2200*880*850 mm | Work Efficiency  | 200~400 ㎡/h* | Rated Power  | 4 kw  | 
*The relevant data comes from the application test of Fangshi Technology engineering